Will Sheffer, lead pump station mechanic for South Burlington Wastewater, talks through the decision to upgrade the Hinesburg Road lift station’s pumps. After a period of removing about a yard of material per month, it was time to upgrade. After seeing a demo of the envie3 air-filled chopper pumps, the decision was easy. And then it was a no-brainer for Sheffer to upgrade the rest as well.
Visit the Crane Pumps & Systems Storefront