Pumps enable tunnel dewatering

Problem: 

A hydroelectric project in the province of Boca de Toro, Panama, included a power plant with a capacity of more than 223 MW, generating energy via two turbines at the dam. Before repair work on a 2.6-mile tunnel under the power plant...